Skip links

ESE 1.2 Set-up of PV systems with hybrid inverters in grid-parallel mode

Alpha Technical Solutions Inc.

ESE 1.2 Set-up of PV systems with hybrid inverters in grid-parallel mode

Training content:

  • PV system installation
  • Set-up and testing of a PV system with grid feed-in and emergency power socket
  • Measurement of energy generated by a PV system
  • Maximum Power Point (MPP) tracking
  • Determining the efficiency of the grid inverter
  • Control operating response of the grid inverter
  • Recording yield data using the solar emulator
  • Investigating the response of the PV system to a grid outage
  • Investigating the provision of emergency power via dedicated emergency power socket
  • Lightning protection of photovoltaic systems
  • Dimensioning and economic efficiency of photovoltaic systems
Basic equipment set, consisting of:
1
Hybrid inverters
Hybrid invertersCO3208-2U
1
Solar panel emulator, 1.5 kW, 500 V
Solar panel emulator, 1.5 kW, 500 VCO3208-1P
1
Variable Ohmic load, three-phase, 1kW
Variable Ohmic load, three-phase, 1kWCO3301-3F
1
Power switch module
Power switch moduleCO3301-5P
1
Lamp board 230V
Lamp board 230VCO3208-1L
Power supply:
1
Three-phase supply for electrical machines
Three-phase supply for electrical machinesCO3212-5V
Measuring instruments:
1
Three-phase power quality meter, display and long-term memory
Three-phase power quality meter, display and long-term memoryCO5127-1S
Software:
1
Patch cable Cat5E 1x 1 m yellow, 2x 2 m yellow
Patch cable Cat5E 1x 1 m yellow, 2x 2 m yellowLM9057
1
USB 2.0 Ethernet adapter, 10/100
USB 2.0 Ethernet adapter, 10/100LM8257
1
5-Port Ethernet Switch
5-Port Ethernet SwitchLM9988
Media:
1
Interactive Lab Assistant: Smart Energies - Residential PV system with storage
Interactive Lab Assistant: Smart Energies – Residential PV system with storageSO2800-6D
Accessories:
12
Safety connecting plug 4mm with tap (2x), black, 1000V/32A CAT II
Safety connecting plug 4mm with tap (2x), black, 1000V/32A CAT IISO5126-3R
5
Safety connecting plug 4mm with tap (2x), gr/ye, 1000V/32A CAT II
Safety connecting plug 4mm with tap (2x), gr/ye, 1000V/32A CAT IISO5126-3W
5
Safety connecting plug 4mm with tap (2x), blue, 1000V/32A CAT II
Safety connecting plug 4mm with tap (2x), blue, 1000V/32A CAT IISO5126-3V
1
Set of safety measurement cables, 4mm, 31 pcs
Set of safety measurement cables, 4mm, 31 pcsSO5148-1L
1
Mobile aluminum experiment stand, 3 levels, power strip with 6 sockets,(1250 x 1970 x 700 mm)
Mobile aluminum experiment stand, 3 levels, power strip with 6 sockets,(1250 x 1970 x 700 mm)ST7200-4C
Additionally recommended:
1
Monitor holder for flat screen monitor of weight up to 15kg/33lbs
Monitor holder for flat screen monitor of weight up to 15kg/33lbsST8010-4T
1
Keyboard adapter for flat screen monitor holders
Keyboard adapter for flat screen monitor holdersST8010-4G
1
Display for Advanced Photovoltaics equipment
Display for Advanced Photovoltaics equipmentCO3301-7N
1
Protection cover for three-level experiment trolleys
Protection cover for three-level experiment trolleysST8010-9Y

 

This website uses cookies to improve your web experience.