EGI 1 Project work “Building service entry with main distribution box”

This project work is intended to cement practical skills, planning for work and materials plus testing and documentation of complete projects. A pre-prepared model is used to train the safe use of common materials and tools.
Training objectives are organised as follows:
Training project, overview
Electricity feed, distribution
Installation of a service entry point for a building
Observing protective measures to prevent electric shocks
Mains systems
Installation of circuitry under plaster (lights and sockets)
Short circuits, faults to frame, faults to ground
Testing electrical systems in accordance with currently applicable standards
Testing TN systems
Testing RCDs
Measurement of insulation resistance, earth resistance and loop resistance
Test of three-phase rotating field, measurement of protective earth resistance, equipotential bonding
Lightning and excess voltage protection
Documentation, handover and test report
Equipment set comprising the following: | ||||
---|---|---|---|---|
1 | ![]() | VDE building management trainer: wiring installation project, sub-distribution | SE2671-3A |
Additionally recommended: | ||||
---|---|---|---|---|
1 | ![]() | Multi13S digital multimeter | LM2330 |
Accessories: | ||||
---|---|---|---|---|
1 | ![]() | Mobile InsTrain/CarTrain/TruckTrain experiment stand, SybaPro 1070x1350x700mm | ST7200-4K | |
1 | ![]() | Monitor holder for flat screen monitor of weight up to 10 kg/22 lbs, VESA 75/100 | ST8010-4L | |
1 | ![]() | Wall or aluminium profile mounting storage for 48 x 4mm cables | ST8003-8E | |
1 | ![]() | Protection cover for CarTrain/InsTrain experiment trolleys | ST8010-9X | |
1 | ![]() | Set of tools ”Electric ” | SE2670-4B |